ISO 21930:2017 is the international EPD standard; EN 15804+A2:2019 is the European version with 13 mandatory indicators. LEED v4 accepts either. DGNB and BREEAM set their own EPD requirements. Geography determines which standard applies.

ISO 21930:2017 and EN 15804+A2:2019 are the two standards governing Environmental Product Declarations for construction products. ISO 21930 is the international version; EN 15804+A2 is the European standard with a larger mandatory indicator set. LEED v4 accepts either. DGNB and BREEAM set their own EPD requirements. Geography and certification programme determine which applies.

Key numbers at a glance

AttributeISO 21930:2017EN 15804+A2:2019
PublisherISO (international)CEN (European)
Original release2007; revised 20172012; amended 2019
Module mapA1-A3, A4-A5, B1-B7, C1-C4, DIdentical
Mandatory GWP split (fossil/biogenic/luluc)No (programme discretion)Yes
WDP indicatorProgramme discretionMandatory (core)
PM indicatorProgramme discretionOptional (additional)
Third-party verification requiredYes (ISO 14025)Yes (ISO 14025)
LEED v4 acceptanceYesYes
DGNB / BREEAM acceptanceCheck the schemeCheck the scheme

What is the difference between ISO 21930 and EN 15804?

ISO 21930:2017 is the international core rules standard for Environmental Product Declarations (EPDs) of construction products and services. ISO 21930 establishes the methodology (lifecycle module map, verification rules, and programme operator requirements) that EPD programme operators worldwide use. ISO 21930 subordinates to ISO 14025, the umbrella Type III environmental declaration standard covering all industries.

EN 15804+A2:2019 is the European equivalent, published by the European Committee for Standardization (CEN). An EN 15804+A2 EPD covers more indicators than ISO 21930 requires; check acceptance with the scheme. EN 15804+A2 sets a core indicator set that includes the split GWP values (GWP-fossil, GWP-biogenic, GWP-luluc, GWP-total) and water deprivation potential (WDP); particulate matter (PM) is an optional additional indicator. ISO 21930 leaves those indicators to programme discretion.

Both standards use the same lifecycle module map: A1-A3 (product stage), A4-A5 (construction), B1-B7 (use), C1-C4 (end of life), and Module D (benefits beyond the system boundary). The structure is identical. The indicator requirements differ.

AEC market trends, new project opportunities, and AI insights

Which EPD standard applies in which country?

Project location and the certification scheme, not architect preference, determine the applicable EPD standard.

RegionRequired standardPrimary programme
EU (any member state)EN 15804 (the CPR 2024/3110 refers to it for environmental calculations); schemes set the version they acceptIBU, INIES, BRE, EPD Norway, Okobaudat
United KingdomCheck local rulesBRE Environmental Profiles / EPD UK
Switzerland and NorwayCheck local rulesNational programmes are ECO Platform members
France (RE2020)Check local rulesINIES
Germany (DGNB)Check the current DGNB criteriaÖkobaudat datasets follow DIN EN 15804
United States (LEED v4)EN 15804 or ISO 21930 — both acceptedCheck the issuing programme
SingaporeCheck local rulesCheck the receiving scheme
AustraliaEPD Australasia verifies construction EPDs to ISO 14025 and EN 15804 (PCR 2019:14); check scheme rulesEPD Australasia (regional partner of the International EPD System)

For a US architect specifying to LEED v4 MR Credit Building Product Disclosure and Optimization, any EPD issued under EN 15804+A2 or ISO 21930 satisfies the requirement. The critical check is that the EPD is Type III (ISO 14025 verified) and covers the applicable product category. National programme membership and the ECO Platform mark are not required for LEED v4 submissions.

Does LEED v4 accept both ISO 21930 and EN 15804?

LEED v4 BD+C MR Credit Building Product Disclosure and Optimization explicitly accepts EPDs that comply with “ISO 14025 and EN 15804 or ISO 21930.”

For US projects, the practical effect is that European manufacturer EPDs (EN 15804+A2) and EPDs under ISO 21930 both qualify for the same LEED v4 submittal. An architect sourcing concrete from a German supplier and insulation from a US manufacturer can submit both EPDs without conversion or adjustment.

DGNB and BREEAM do not carry the same dual-acceptance language as LEED v4. Ökobaudat, the German federal database, requires its datasets to comply with DIN EN 15804. For DGNB and BREEAM projects, check each scheme’s current EPD requirements before accepting an ISO 21930-only EPD from a non-European manufacturer.

What lifecycle modules does ISO 21930 require?

ISO 21930:2017 uses the same module map as EN 15804 and EN 15978 (A1-A3, A4-A5, B1-B7, C1-C4 and D; module definitions in EN 15978 explained). A1-A3 are mandatory in all ISO 21930-compliant EPDs, A4-A5 are declared where data is available, and Module D is declared separately and not included in lifecycle totals.

ISO 21930 sets minimum indicator requirements per module. EN 15804+A2 expands the mandatory indicators for the same modules, particularly the GWP split and WDP additions, without changing the module structure itself.

Common mistakes when specifying EPD standards

1. Assuming all Type III EPDs carry equivalent indicators. A Type III EPD verified under ISO 21930 may report fewer environmental indicators than an EN 15804+A2 EPD. For DGNB or BREEAM projects, check the scheme’s current EPD requirements before accepting an ISO 21930-only EPD from a non-EU manufacturer. Confirm the certification programme’s EPD version requirements before the specification phase.

2. Mixing EPD standards without verifying each document. LEED v4 accepts both ISO 21930 and EN 15804. Each individual EPD must satisfy one standard on its own terms. An EPD that satisfies neither is ineligible, regardless of manufacturer sustainability claims. Check each EPD’s verification statement, not just the manufacturer’s data sheet.

3. Ignoring the GWP split requirement. EN 15804+A2 requires GWP to be reported as four values: GWP-fossil, GWP-biogenic, GWP-luluc (land use and land use change) and GWP-total. ISO 21930 does not mandate the split. An EN 15804+A2 EPD and an ISO 21930 EPD with a single GWP figure are not directly comparable on that indicator. Verify alignment before cross-standard comparisons.

4. Treating ISO 21930 as obsolete. ISO 21930:2017 is active, and LEED v4 accepts EPDs under it. Outside Europe, check which standard the local programme and the receiving scheme use; for example, EPD Australasia verifies construction EPDs to ISO 14025 and EN 15804.

Frequently asked questions

What is ISO 21930 in construction?

ISO 21930:2017 is the international core rules standard for Environmental Product Declarations (EPDs) of construction products and services. ISO 21930 provides the methodological framework (module map, verification rules, programme operator requirements) that EPD programme operators worldwide use. For EU projects, EN 15804+A2:2019 sets the larger mandatory indicator set. For LEED v4 projects, ISO 21930 is explicitly accepted alongside EN 15804.

Does EN 15804+A2 supersede ISO 21930?

EN 15804+A2 is not a replacement for ISO 21930, and an EN 15804+A2 EPD covers more indicators than ISO 21930 requires; check acceptance with the scheme. EN 15804+A2 mandates more core indicators (the GWP-fossil/biogenic/luluc split and water deprivation potential WDP) that ISO 21930 leaves to programme discretion. Particulate matter is an optional additional indicator under EN 15804+A2. ISO 21930:2017 remains the active international standard for non-EU markets.

Which EPD standard does a programme use?

The ECO Platform network of European programme operators, including IBU (Germany), INIES (France), BRE (UK), and EPD Norway, aligns with EN 15804+A2. For products from other markets, check which standard the issuing programme verified the EPD against.

What lifecycle modules does ISO 21930 cover?

ISO 21930:2017 covers the same module map as EN 15804: A1-A3 (product stage), A4-A5 (construction process), B1-B7 (use stage), C1-C4 (end of life), and Module D (benefits beyond the system boundary). A1-A3 is the minimum required for EPD publication. EN 15804+A2 applies the same module map with a larger mandatory indicator set.

Can ISO 21930 EPDs be used for DGNB certification?

Check the current DGNB criteria for the EPD requirements of the system version you are certifying under. Ökobaudat datasets must comply with DIN EN 15804, and an ISO 21930-only EPD reports fewer mandatory indicators than an EN 15804+A2 EPD (no required GWP split or WDP), so confirm with DGNB that it is accepted before including it in the certification documentation.