AEC workflow
Check Code & Quality
Move from the applicable standard and project scope to a check or complete-set review.
145 resources shown.
Follow the process
How to turn a code question into a traceable review
Begin with the applicable source and a defined question, not a calculator result. Build a small review record that connects project facts, the method you can actually use, its output and the design action that follows. This sequence helps a team distinguish a completed subcheck from work that still needs a specialist or authority decision.
Your deliverable: A code-review matrix connecting each question to its governing source, drawing revision, inputs, result, unresolved issues and responsible reviewer.
Skip to the resource library ↓Before you start
- Project location, project stage and the authority responsible for the question being reviewed.
- The adopted documents, edition and amendments, or a named owner for resolving which sources apply.
- A current drawing or model revision with room uses, measured areas and the relevant component information.
- A preparer, responsible reviewer and a way to record unresolved questions without calling them passed.
Establish the governing source and review question
- Inputs
- Project location, proposed work, review purpose and the available adoption and project documents.
- Action
- Write one checkable question per row. Identify the governing document, edition, amendments and any project-specific interpretation to be confirmed. Record where that decision came from and who resolves uncertainty; the newest model-code edition is not automatically the project requirement.
- Output
- A source-and-scope row for each question, with unresolved adoption or interpretation issues assigned.
- Review checkpoint
- Can the reviewer trace the stated requirement to the applicable source rather than a search snippet?
- Common mistake
- Starting with a convenient calculator edition and assuming the project uses that edition.
Resources for this step
- UpCodes technology overview
Review a vendor-documented code-research option, then verify the governing text and local applicability with the responsible authority.
- Record the governing basis
Keep the source, edition and interpretation owner in the same record as the question.
Record the project facts the method needs
- Inputs
- Current plans, room-use information, area definitions and the component or route being evaluated.
- Action
- Collect the facts required by the chosen check. Keep a space function distinct from a building occupancy classification, label the area basis and units, and identify whether the question concerns a space, a story or a component. Leave missing facts open rather than replacing them with a favourable assumption.
- Output
- A revision-linked input schedule with units, measurement references and explicitly missing information.
- Review checkpoint
- Do the inputs describe the same physical scope and revision as the question in the review matrix?
- Common mistake
- Reusing one area or classification for every check, even when the method asks for a different basis.
Resources for this step
- IBC occupant load calculator
Inspect the supported functions of space and required area basis before choosing inputs; an unlisted function is not an invitation to select the nearest row.
Match each question to an implemented method
- Inputs
- The source-and-scope matrix, input schedule and the tool’s stated supported and excluded cases.
- Action
- Check the tool’s edition, required conditions and exclusions against the project before running it. Separate occupant load, exit count, capacity-based width and route limits into their own questions. Send an unsupported case to the appropriate source-based analysis instead of extending a calculator by analogy.
- Output
- A method-selection record: supported subchecks, excluded cases and the next reviewer for each gap.
- Review checkpoint
- Does the tool implement this exact case, including the space-versus-story distinction where required?
- Common mistake
- Treating an exit-count answer as evidence that exit capacity, dimensions and travel conditions are also resolved.
Resources for this step
- IBC required exits calculator
Choose its explicit space or story scope for exit-count questions; it does not settle the entire egress design.
- IBC travel distance calculator
Inspect its supported Group B scope and separate route checks rather than assuming coverage of every occupancy.
Run the supported checks and preserve their inputs
- Inputs
- Complete inputs for a supported method, its governing source and the project revision being checked.
- Action
- Run each supported check and save its inputs and result together. Before transferring an output to another tool, confirm units, scope, edition and the downstream input definition. Keep a cannot-determine response as an unresolved item, not as zero, a pass or a number to round away.
- Output
- Reproducible subcheck records, including results that remain unresolved and their reasons.
- Review checkpoint
- Could someone reproduce the result, and does the downstream check accept this quantity on the same basis?
- Common mistake
- Copying a result without its conditions, or using a capacity calculation as the final component dimension.
Resources for this step
- IBC egress capacity calculator
Use the capacity-based width output for that subcheck only; component minimum dimensions and other requirements need separate review.
Translate findings into owned design actions
- Inputs
- Subcheck records, the coordinated drawings and open questions from the other disciplines.
- Action
- Mark where each finding affects the drawings or model, assign an owner and define what evidence would close it. Review requirements outside the calculator’s scope, conflicts between checks and changed design assumptions. Escalate unresolved interpretations rather than closing them with a generic compliance statement.
- Output
- An issue register linked to drawing locations, responsible owners and explicit closure evidence.
- Review checkpoint
- Has each numerical result been checked against the actual design and every excluded requirement assigned?
- Common mistake
- Closing a design issue because one calculator returned a number while another necessary check remains open.
Resources for this step
- Record findings and review owners
Use the handover fields to connect a calculation record to the drawing action and closure evidence.
Hand over the review record and control revisions
- Inputs
- Source matrix, inputs, subchecks, marked-up design information and the issue register.
- Action
- Have the responsible reviewer record what was reviewed, what remains unresolved and the next decision. Retain the source and design versions with the record. When a room use, geometry, source interpretation or design revision changes, identify which checks must be repeated before reusing their outputs.
- Output
- A versioned review package with review status, unresolved items and triggers for repeating affected checks.
- Review checkpoint
- Does the recipient know which subchecks were reviewed and which decisions still belong to an authority or specialist?
- Common mistake
- Labelling the whole project compliant because a checklist or a collection of isolated calculations is complete.
Resources for this step
- Copy the code-review handover checklist
Transfer the traceable record into the team’s own documents without losing exclusions or unresolved decisions.
Worked journey: a changed room-use question
Synthetic training example only: no jurisdiction, code value or compliant design is established here. The example demonstrates how to retain an unresolved question instead of manufacturing a result.
- Governing basis
- A team receives a changed room-use brief. It assigns an owner to confirm the adopted source and records the design revision before choosing a method.
- Project facts
- The room label is not enough to establish its function. The preparer obtains the intended use and measurement basis, keeping the unanswered items visible.
- Method scope
- One proposed use is outside the available calculator’s supported rows. The team assigns that case for source-based review rather than selecting a convenient row.
- Checks
- Only supported cases with complete inputs are calculated. An unresolved upstream quantity is not passed downstream as zero.
- Design review
- The issue register separates exit-count, capacity, component-dimension and route questions. Each has an owner and a specific closure requirement.
- Handover
- The package records the reviewed subchecks and the open decisions separately. A later room-use or layout change triggers another check; no whole-building compliance conclusion is claimed.
Code-review handover checklist
Select and copy the checklist into your project document. Complete it there; this page does not save project information.
Back to the code review process ↑
145 connected resources
Explore this workflow
AEC technology profiles connected to this workflow.
UpCodes
Searchable, AI-assisted building-code research platform with an NLP-parsed multi-jurisdiction code library
Open resource →/slantis
Professional BIM production and consulting services for AEC firms
Open resource →Adaptis
AI-powered building lifecycle carbon optimization and capital planning
Open resource →ADU Pilot
AI-generated ADU feasibility, zoning, and permit-risk reports by property address
Open resource →ArcDox
BIM consultancy and professional services for construction projects
Open resource →Archi-Assist
Revit-integrated analytics dashboard for residential project statistics
Open resource →ArkDesign.AI
AI-powered design & feasibility studies for multi-family projects
Open resource →AutoSitu
AI-native workspace for municipal development reviews
Open resource →BIM Energy
Building energy simulation for renovation planning
Open resource →Blueplan
AI-powered code compliance for architects
Open resource →BREEAM Score Estimator
Estimate BREEAM certification level and calculate your building project's sustainability score
Open resource →Building Height Calculator (from zoning)
Calculate building height from existing grade and verify zoning compliance
Open resource →C.Scale
Whole-life carbon assessment tool for building design and construction
Open resource →ClearCalcs
Cloud-based structural design calculation software with transparent formulas
Open resource →ClimateStudio
Environmental performance analysis plugin for Rhino
Open resource →CodeComply.Ai
AI-powered building code compliance automation
Open resource →CODiii Scout
AI-powered design compliance assistant for architects and engineers
Open resource →CONIX.AI
AI-powered villa architectural design for Saudi market
Open resource →ControlQore
Cloud-based financial management platform built for construction
Open resource →Deep Space
All-in-one construction management platform with AI-powered insights
Open resource →Deep Space Explorer
AI-powered Revit analytics platform
Open resource →digiQC
Digital quality control and inspection platform for construction
Open resource →Document Crunch
AI-powered construction contract intelligence and risk management
Open resource →dRofus
Cloud-based requirements and space planning platform for AEC/O collaboration
Open resource →Earth Pressure Coefficient Calculator
Calculate Ka, Kp, K0 for retaining walls and underground structures
Open resource →Egnyte
AI-powered cloud content management for AEC teams
Open resource →Facilio
AI-powered CMMS and facilities management for multi-site portfolios
Open resource →Finch3D
AI-powered generative design for rapid floor plan exploration
Open resource →Footing Size Calculator
Calculate required footing dimensions from soil bearing capacity and column load
Open resource →Helonic
AI clash detection and code compliance review for 2D construction drawings
Open resource →Ichi
AI for building code compliance and construction administration
Open resource →innDex
All-in-one construction site management platform
Open resource →Knetyc
AI-powered municipal building code compliance
Open resource →Kolega
AI-powered generative design for residential site planning
Open resource →Kwant
AI-powered workforce management and safety platform with IoT wearables
Open resource →Measurabl
ESG data management and sustainability reporting platform for real estate portfolios
Open resource →Nomic AI
Domain-specific AI for code compliance and document intelligence in AEC
Open resource →One Click LCA
AI-powered sustainability platform for embodied carbon assessment
Open resource →PLANALOGIC
AI-powered real estate design optimization platform
Open resource →Retaining Wall Stability Checker
Analyze cantilever and gravity retaining walls for sliding, overturning, and bearing capacity
Open resource →No matching resources in this tab.
Browse all tools →Calculators and estimators that support this workflow.
IBC 2024 Egress Capacity
Capacity-based width only; component minimums remain a separate check
Open resource →IBC 2024 Occupant Load
38 functions of space → model-IBC occupant load
Open resource →IBC Required Exits
Space or story → required exit count; other cases are not calculated
Open resource →ADA Accessible Route Width
Walking-surface width check vs ADA 2010 §403.5.1
Open resource →ADA Elevator Requirement
Car dimensions vs ADA 2010 Table 407.4.1
Open resource →Allowable Building Area
IBC 2024 Equation 5-1 + Table 506.3.3 frontage factor
Open resource →Circuit Breaker Size
Verified loads and factor → entered-rating comparison
Open resource →Commercial Electrical Load Calculator
Verified demand-load schedule → total VA and arithmetic line current
Open resource →Exit Sign Spacing
Corridor length + viewing distance → signs needed
Open resource →IBC 2024 Plumbing Fixture
Occupant load + selected actual use → IBC 2024 Table 2902.1 fixture counts
Open resource →IBC Travel Distance
Separate Group B travel, common-path, and dead-end model-code limits
Open resource →Sabine RT60
Room volume + surface absorption coefficients → RT60 per Sabine formula
Open resource →Stair Headroom
Check clearance vs IBC §1011.3 / IRC 80" (spiral 78")
Open resource →STC Requirements
IBC residential target or verified project target → documented rating comparison
Open resource →Transformer Sizing
Load (kW/kVA/amps) → required kVA + standard rating
Open resource →Voltage Drop
NEC Ch.9 Table 9 effective-Z method, 3%/5% check
Open resource →Wire Ampacity
Verified table value + factors + termination cap → ampacity comparison
Open resource →No matching resources in this tab.
Browse all calculators →Guides, references, research, and documented implementations for this workflow.
Acoustic Ceiling Tiles for Healthcare: FGI Rules, NRC and CAC
FGI ceiling rules by area: monolithic in operating rooms, gasketed grid or one-pound tiles in semirestricted areas, NICU NRC 0.95 over 80% of the ceiling (or 0.85 average) and CAC 29 (FGI 2010).
Open resource →Acoustic Design Requirements: STC, NRC, and NC Ratings by Space Type
NC ratings, STC and NRC by space type: STC 53 videoconference, STC 40 private-office partitions (GSA), NRC by room, ASHRAE HVAC background noise.
Open resource →ADA Accessible Route Requirements: 36 Inches, 1:20 Slope, and Every Number That Matters (2024)
36-inch minimum clear width, 1:20 maximum running slope, 200-foot maximum passing space interval. Our analysis of ADA §402–403 shows which three dimensions trigger the most plan review corrections.
Open resource →ADA Door Clearance Requirements: 32-Inch Minimum, 7 Approaches (2024)
32-inch minimum clear width, 18-inch latch-side pull clearance, 60-inch perpendicular depth for a front-approach pull: every number from ADA §404 by approach.
Open resource →ADA Parking Requirements: Space Counts, Dimensions, Van Rules (2024)
1 accessible space per 1–25 total, 96-inch car width, 132-inch van width, 60-inch access aisle, 1 van space per 6: ADA §208 and §502 counts and dimensions.
Open resource →ADA Ramp Requirements: Slope, Width, and Landings Explained (2024)
1:12 maximum running slope, 36-inch minimum clear width, 30-inch maximum rise per run. Our comparison of 4 dimensions from ADA §405 shows where firms most often fail plan review.
Open resource →ADA Restroom Requirements: Dimensions, Grab Bars, Clearances (2024)
60-inch turning circle, 16–18-inch water closet centerline, 42-inch side grab bar, 34-inch max lavatory rim: ADA §603–§606 and §609 dimensions for toilet rooms.
Open resource →Approved Documents for England: Critical Numbers Across the Main Parts
Key dimensions and limits from the England Approved Documents (Parts A, B, C, F, H, J, K, L, M, O and Q), with the edition and amendment date of each so you can tell which version a number comes from.
Open resource →ASHRAE 62.1 Ventilation Rates: Required cfm by Occupancy (2024)
ASHRAE 62.1 ventilation rates: 5 cfm/person for offices, 20 for gyms, 0.12 cfm/ft² for classrooms; every zone needs both the Rp and Ra terms.
Open resource →ASHRAE 90.1-2019 Air Barrier Requirements: Leakage Limits and Verification
ASHRAE 90.1-2019 air leakage criteria: 0.004 cfm/ft² for materials, 0.04 for assemblies and 0.40 for the whole building at 75 Pa, with the exceptions, plus the 2021 IECC residential ACH50 limits.
Open resource →ASHRAE 90.1-2019 Lighting Power Density: LPD Limits and Controls
ASHRAE 90.1-2019 interior lighting power allowances compared with 90.1-2016: open-plan office 0.61 W/ft², office building 0.64 W/ft², plus the §9.4 control triggers.
Open resource →ASHRAE 90.1-2019 Mechanical Requirements: Economizer and Energy Recovery Rules
ASHRAE 90.1-2019 Table 6.5.1-1 economizer threshold (54,000 Btu/h; 33,000 for units outside the building under addendum ci) and the §6.5.6.1.2 exhaust air energy recovery rule with its 50% minimum.
Open resource →BauGB Bauplanungsrecht: Zulässigkeit nach §34, §35 und Bebauungsplan
Bebauungspläne der Innenentwicklung mit weniger als 20.000 m² Grundfläche im beschleunigten Verfahren ohne Umweltprüfung (§13a BauGB), Außenbereich grundsätzlich bebauungsfeindlich (§35 BauGB), Befreiung nach §31 Abs.2 nur, wenn die Grundzüge der Planung nicht berührt werden. Das gesetzliche Planungsgerüst für jedes Bauprojekt in Deutschland.
Open resource →BauNVO Baugebiete: GRZ und GFZ nach §17 richtig anwenden
GRZ 0,4 für reine Wohngebiete, GFZ 3,0 für urbane Gebiete, Überschreitung der GRZ durch Garagen und Nebenanlagen bis 50 Prozent, höchstens GRZ 0,8 (§19 Abs.4). Orientierungswerte, Gebietstypen und häufige Planungsfehler.
Open resource →Brandschutz nach MBO: Gebäudeklassen und Feuerwiderstand F30 bis F90 (Fassung 2002, Stand 2024)
5 Gebäudeklassen, Feuerwiderstand F30/F60/F90, innere Brandwände in Abständen von höchstens 40 m. Anforderungen nach MBO §§14 und 26–36. Die MBO ist ein Muster; verbindlich sind die 16 Landesbauordnungen.
Open resource →DIN 18040 Barrierefreiheit: Maße, Anforderungen und Planungsfehler (DIN 18040-1:2010-10)
90 cm lichte Türbreite, 25 N Öffnungskraft (DIN EN 12217 Klasse 3), 6 % maximale Rampeneigung: die wichtigsten Maße nach DIN 18040-1 und die Verankerung in MBO §50 und §39.
Open resource →EPBD 2028 Architect Requirements: Zero-Emission Buildings and Whole-Life Carbon Under Directive 2024/1275 (2026)
From 1 January 2028, new buildings owned by public bodies must be zero-emission. From 1 January 2030, all new buildings. Whole-life GWP disclosure in the energy performance certificate applies above 1,000 m² useful floor area from 2028 and to all new buildings from 2030.
Open resource →EU Taxonomy for buildings: Activities 7.1, 7.2, and 7.7 requirements explained (2026)
Activity 7.1 requires primary energy demand at least 10% below the NZEB threshold, plus testing and a life-cycle GWP calculation disclosed on demand for buildings above 5,000 m². Activity 7.2 covers renovation and Activity 7.7 acquisition of buildings.
Open resource →FGI AII Room Requirements: Design and Ventilation (2010 Edition)
12 total air changes per hour, –0.01 in. wc minimum pressure differential, 2 outdoor ACH: what the FGI 2010 Guidelines and ASHRAE/ASHE 170-2008 say about airborne infection isolation rooms, and why to check the adopted edition.
Open resource →FGI Behavioral Health Design: Ligature-Resistant Requirements Explained (2018 and 2022 Editions)
2,000 ft-lb exterior window impact load, 1 seclusion room per 24 beds or major fraction, 8% minimum net glazed area for social and dining spaces: what the FGI 2018 and 2022 Hospital Guidelines say, and what is only guidance.
Open resource →FGI Emergency Department Requirements: Room Sizes, Trauma Clearances, and Decontamination (2010 Edition)
120 sq ft treatment rooms, 250 sq ft trauma rooms with 5 ft clearance around the stretcher, a 6 ft trauma doorway and an 80 sq ft decontamination room: what the FGI 2010 Guidelines say, and why to check your state's adopted edition.
Open resource →FGI Imaging Department Requirements: Room Sizes, Shielding, and Support Spaces (2010 Edition)
Control alcove 3 ft 6 in from the exposure control, MRI sized to manufacturer requirements with a four-zone layout, CT 3 ft clear on three sides, cath procedure room 400 sq ft: what the FGI 2010 Guidelines say, and why to check your state's adopted edition.
Open resource →FGI NICU Design Requirements: Room Sizes, Acoustics, and Lighting (2010 Edition)
120 sq ft per infant bed in multiple-bed rooms, 150 sq ft in single-infant rooms, 45 dBA hourly Leq in infant rooms: what the FGI 2010 Guidelines say, and why to check your state's adopted edition.
Open resource →FGI Patient Room Requirements: Minimum Dimensions, Clearances, and OR Sizes (2010 and 2022 Editions)
120 sq ft minimum for a single-bed med/surg room and 200 sq ft for ICU in the 2010 edition, 400 sq ft for an operating room, 600 sq ft for large-equipment rooms. Each number is tied to the edition it comes from.
Open resource →FGI surgical suite requirements: OR sizing, ventilation, and recovery space standards (FGI 2010 edition)
400 sq ft for general ORs and 600 sq ft for large-equipment ORs, with ventilation of 3 or 4 outdoor and 15 or 20 total air changes depending on surgery class. Values from the FGI 2010 edition, with FGI 2022 OR clearances noted.
Open resource →Gebäudemodernisierungsgesetz (GModG, früher GEG): Heizungsanlagen und U-Werte bei Änderung
Seit 29. Juli 2026 ist die 65-Prozent-Regel (§§71–73 GEG) gestrichen. Für neu eingebaute Gas-, Öl- und Flüssiggasheizungen gilt stattdessen eine Stufenpflicht von 10, 15, 30 und 60 Prozent (§43 GModG). U-Werte bei Änderung stehen jetzt in §36 mit Anlage 7.
Open resource →How to Calculate Egress Width: IBC 2024 Capacity Factors
Egress width = occupant load × 0.3 in on stairs or 0.2 in elsewhere (IBC 2024 §1005.3), then the minimums: stairs 44 in, doors 32 in, corridors 44 in.
Open resource →How to Calculate Occupant Load: IBC 2024 Table 1004.5 Factors
Occupant load = floor area ÷ IBC 2024 Table 1004.5 factor: 150 sq ft gross per person for business, 15 net unconcentrated assembly, 7 net concentrated.
Open resource →IBC 2024 Corridor Width Requirements: 36 vs 44 Inches, Dead Ends and Capacity
IBC corridor width: 44 inches general minimum, 36 inches under 50 occupants (Table 1020.3), 72 inches in Group E corridors, 96 inches in Group I-2.
Open resource →IBC 2024 Egress Door Requirements: Width, Swing, Force, and Hardware
IBC door requirements, 2024: 32 in clear width, 80 in height, 5 lbf interior push force, 1/2 in threshold, swing with travel at 50 or more occupants.
Open resource →IBC 2024 Key Changes: Selected Changes from the 2021 IBC
Selected 2024 IBC changes from 2021: egress, doors, handrails, accessible routes, unvented attics, safety glazing, plumbing fixtures, temporary structures.
Open resource →IBC 2024 Ramp Requirements: Slope, Width, Landings, and Accessibility
IBC ramp requirements, Section 1012: 1:12 maximum slope, 36 in clear width between handrails, 30 in maximum rise per run, 60 in landings; ADA separate.
Open resource →IBC Building Height and Area Limits by Construction Type (2024)
IBC height and area limits by occupancy, construction type and sprinklers (Tables 504.3, 504.4, 506.2): Type IA unlimited, Type VB 40 ft (60 sprinklered).
Open resource →IBC Change of Occupancy: Three IEBC Paths to Compliance (2024)
Level 3 threshold at 50% work area, path-of-travel cost cap at 20%, three IEBC 2021 compliance methods. One framework explains when a renovation triggers…
Open resource →IBC Concrete Construction: Compressive Strength, Cover, and Seismic Rules (2024)
3,000 psi minimum for SDC D/E/F foundations, 3/4-inch cover for interior slabs, 3-1/2-inch minimum slab-on-grade thickness. Get one number wrong and the drawings come back.
Open resource →IBC Construction Types: Type I–V and Table 601 Explained (2024)
IBC Table 601: 5 construction types in 12 subtypes, 0 to 3 hours of fire resistance for frame, bearing walls and floors, set before height or area.
Open resource →IBC Daylighting and Ventilation Requirements (2024 Chapter 12)
IBC 2024 Chapter 12: 8% net glazed area for natural light, 4% openable area for ventilation, 10 footcandles of artificial light; bathroom and attic rules.
Open resource →IBC Elevator Requirements: Stretcher and Fire Service Access (2024)
IBC elevator requirements 2024: fire service access elevators above 120 ft of occupied floor, a stretcher car under §3002.4, accessible-route triggers.
Open resource →IBC Exit Requirements: Occupant Load and Travel Distance (2024)
IBC exit requirements: 2 exits from any story with 1–500 occupants, 3 from 501–1,000, 4 above 1,000 (Table 1006.3.3); one exit up to 49 occupants.
Open resource →IBC Exterior Wall Requirements: Cladding and Fire Rules (2024)
IBC exterior walls: 1 water-resistive barrier layer lapped 2 in horizontally, 6 in at end joints; combustible cladding limits above 40 ft on Type I–IV.
Open resource →IBC Fire Separation Requirements by Occupancy (2024)
IBC fire separation is not a generic 2-hour wall: pick accessory, nonseparated or separated occupancies under §508, then read Table 508.4 by occupancy.
Open resource →IBC Foundation Types: Minimum Depths, Bearing Capacities, and Concrete Strengths (2024)
12,000 psf for crystalline bedrock, 1,500 psf for clay, 3,000 psi minimum concrete in SDC D. Organic soils get no assumed presumptive bearing value under IBC §1806.2 unless data are submitted.
Open resource →IBC Guardrail and Handrail Requirements: Heights and Openings (2024)
IBC guardrail requirements: 42 in minimum guard height in commercial use, 34–38 in handrails on stairs and ramps, 4 in maximum sphere opening in guards.
Open resource →IBC Interior Finish: Flame Spread Classes Explained (2024)
IBC interior finish classes: Class A flame spread 0–25, Class B 26–75, Class C 76–200, smoke-developed index 450 or less for all; what each room needs.
Open resource →IBC Occupancy Classification: Groups A Through U Explained (2024)
IBC occupancy classification, Groups A through U: 26 sub-classifications and the chapter that sets height, area, sprinkler and egress limits for each.
Open resource →IBC Plumbing Fixture Counts by Occupancy (2024)
IBC plumbing fixture count from Table 2902.1: toilet and lavatory ratios for business, mercantile, assembly and residential uses, plus a free calculator.
Open resource →IBC Roof Assembly: Fire Classes, Drainage, and Wind Rules (2024)
Class B minimum roof covering for six construction types in IBC 2024 Table 1505.1, 0.019-in (No. 26 galvanized) flashing per §1503.2.1, drainage and wind.
Open resource →IBC Room Requirements: Ceiling Height, Width, Floor Area, and Ventilation
IBC ceiling height: 7 ft 6 in minimum in occupiable spaces, 7 ft in bathrooms, kitchens, hallways and storage; 70 sq ft habitable rooms, 7 ft wide.
Open resource →IBC Seismic Design Categories: A Through F Explained (2024)
Seismic design category A to F in one table with what each requires, plus Risk Category and site class tables and the 2024 IBC and ASCE 7-22 steps.
Open resource →IBC Sprinkler Requirements: When a System Is Required (2024)
When is a sprinkler system required? Group R and I always; A-2 at 5,000 sq ft or 100 occupants; any occupied floor over 55 ft above fire-department access.
Open resource →IBC Stair Requirements: Width, Rise, Run, Headroom, Handrails (2024)
44-inch minimum stair width (36 inches under 50 occupants), 7-inch max riser, 11-inch min tread, 80-inch headroom, 0.3 in per occupant capacity: IBC 2024 §1011.
Open resource →IBC Window Requirements: Natural Light and Safety Glazing (2024)
IBC safety glazing requirements: hazardous locations within a 24-inch arc of doors and in wet areas, 4-inch skylight curb, 8% net glazed area for daylight.
Open resource →IBC Wood Framing: Conventional Light-Frame Limits and NDS Design Rules (2024)
130 mph wind cap, 1 story in SDC D/E, 5/8-in anchor bolts in SDC E. Every code threshold for wood construction under IBC Chapter 23 and AWC NDS, with §section citations.
Open resource →IECC Energy Code: R-Values, U-Factors, and Climate Zones (2024)
IECC climate zones 1–8: R-49 attic insulation in cold zones, U-0.30 window maximum in zones 7–8, 4 compliance paths; where the 8 zones' R-values differ.
Open resource →IMC Exhaust Requirements (2024): Kitchen Hoods, Grease Ducts, Dryers
2024 IMC exhaust by system: kitchen hoods and grease ducts (§506–508), domestic cooking (§505), clothes dryers (§504), parking garages (§404), Chapter 4 rates.
Open resource →Insulation R-Values by Climate Zone: 2021 IECC Requirements
Insulation R-value by climate zone, 2021 IECC Table R402.1.3: ceiling R-49 in zones 2–3, R-60 in zones 4–8, plus wall, floor, slab and fenestration values.
Open resource →IPC Drain-Waste-Vent: Sizing, Slope, and Vent Distances (2024)
IPC drain-waste-vent, 2024: 1-inch water column trap seal limit, 100-ft cleanout intervals, 6-ft trap-to-vent maximum for lavatories, slope by pipe size.
Open resource →IPC Water Supply Requirements: Pressure and Backflow Rules (2024)
IPC water supply, Chapter 6: 80 psi maximum static pressure, 50-ft hot-water pipe limit, 0.25% lead content cap, pipe sizing and backflow protection rules.
Open resource →Japan Building Standards Act: FAR Limits, Fire Rules, and Structural Requirements
FAR values of 50–1,300% by district, the 3 m and 5 m rule for parts liable to catch fire, and Article 20 structural safety routed by building size. A guide to Japan's BSA for international architects.
Open resource →Landesbauordnung Deutschland: Abstandsflächen, Gebäudeklassen und Sonderbauten (MBO-Stand 2024)
0,4 H Regelabstandsfläche (mind. 3 m) nach MBO §6 Abs.5, Hochhaus über 22 m, Sonderbau ab mehr als 1.600 m² Grundfläche des größten Geschosses. Wer die falsche LBO-Fassung anwendet, riskiert eine anfechtbare Baugenehmigung.
Open resource →Masonry Construction Requirements: Lap Splice Lengths, Adobe Standards, and IBC Chapter 21 (2024)
40 bar diameters minimum lap splice, 12-inch absolute floor, No. 9 bar maximum for laps. IBC 2024 Chapter 21 and TMS 402 numbers every masonry designer must know.
Open resource →Mexico City Building Code (RCDF): Permits, DRO, Corresponsables, and Soil Zones
How the RCDF works: manifestación de construcción types, special licences, the Director Responsable de Obra, the Corresponsables, the bitácora, and the three geotechnical zones. Edition: text last amended 19 April 2021.
Open resource →Norway TEK17: Lift Requirements and Universell Utforming Explained
1.1 m × 2.1 m minimum lift cab in buildings of 3 storeys or more, lift required at 2 storeys for public buildings and workplaces, 50% small-unit exemption applies to accessible-dwelling fit-out only. Norway's TEK17 universell utforming rules decoded.
Open resource →OIB-Richtlinien 2023: 40 m Gehweglänge in Betriebsbauten, 12 % Lichteintrittsfläche, Radon
40 m Gehweglänge zum Ausgang, 12 % Lichteintrittsfläche, 300 Bq/m³ Radon-Referenzwert. OIB-RL 2.1 und OIB-RL 3 (Ausgabe Mai 2023) in konkreten Planungszahlen, mit dem Stand der Umsetzung in den Bundesländern.
Open resource →OSHA Construction Safety: Fall Protection and Scaffolds (2024)
6-foot fall protection trigger, 4:1 scaffold load ratio, 2-inch floor hole threshold. What architects must know from OSHA 29 CFR 1926 without assuming…
Open resource →RE2020 France: Six Indicators That Govern Energy and Carbon in New Construction (Guide RE 2020, May 2025)
Electricity primary energy factor drops from 2.58 to 2.3, schools face DH_max of 900 °C·h in Category 1, and lifecycle carbon is calculated over a 50-year reference period. France's RE2020 sets limits on operational energy and on embodied construction carbon in one calculation.
Open resource →SiGePlan nach BaustellV: Pflichten, 500-Personentage-Schwelle und Anhang-II-Tätigkeiten
500 Personentage oder mehr als 30 Arbeitstage mit mehr als 20 Beschäftigten, 10 Anhang-II-Tätigkeiten, SiGePlan nach BaustellV §§2-4 mit Berechnungsbeispiel und häufigen Fehlern.
Open resource →Soil Bearing Capacity IBC: Presumptive Values, Table 1806.2 (2024)
1,500 psf for clay and silt to 12,000 psf for bedrock in IBC 2024 Table 1806.2, lateral values in psf/ft, and when §1803 requires a geotechnical investigation.
Open resource →Spain CTE: Building Code Compliance Requirements
What the CTE requires: the Documentos Básicos, DB-SI fire resistance, DB-HR acoustic limits, DB-SUA accessible routes, DB-HE photovoltaics above 1,000 m², and the LOE liability periods of 1, 3 and 10 years.
Open resource →Stair Code Requirements: IBC, UK, NCC, NBC and TEK17 Compared (2024)
IBC 2024 max riser 7 in (178 mm) vs 150–220 mm for an England private stair and 115–190 mm under NCC 2022: rise, going, width, headroom and handrails by code.
Open resource →Steel Construction Requirements: AISC 360, AISC 341, and IBC 2024 (2024)
R=8 for Special Moment Frames, AISC 341 mandatory in SDC D, and special inspection required for all welds under IBC §1705.2. The Seismic Design Category determines whether one standard applies or two.
Open resource →Treppenmaße nach Bauordnung: Alle Vorschriften auf einen Blick (2024)
DIN 18065 Treppenmaße: Steigung max. 180 mm, Auftritt min. 260 mm, Schrittmaß 2a+s = 63 cm; Treppenbreite, Handlauf, Geländerhöhe nach MBO/LBO.
Open resource →UL Fire-Rated Wall Assemblies: How to Find the Right One for Your Spec (2026)
UL wall assemblies: UL 263 test path, 1- to 4-hour ratings, STC 50 per IBC §1206, how to read U305, U419 and V438, and the head-of-wall joint specs miss.
Open resource →Whole-life carbon rules by country: five national regimes and the EU overlay (2026)
Denmark limits new buildings above 1,000 m² to 12 kgCO₂e/m²/yr under BR18. France, the Netherlands, Sweden and Finland each use a different mechanism. EPBD 2024/1275 requires life-cycle GWP disclosure in the EPC from 2028 and 2030.
Open resource →WUI Construction Requirements: 2024 IWUIC and 2025 California Part 7
Determine WUI construction requirements from the adopted hazard map, code and amendments, then coordinate access, water supply, defensible space, ignition-resistant construction, building components, and maintenance.
Open resource →No matching resources in this tab.
Browse all guides →Source-verified datasets connected to this workflow.
ADA Accessibility Standards
Full text of 2010 ADA Standards for Accessible Design and ADA/ABA Accessibility Guidelines from the U.S. Department of Justice.
Open resource →AECBench — LLM Evaluation for AEC
4,800 questions across 23 task types from ECADI + Tongji University covering building codes, design calculations, and construction management.
Open resource →ARCAT — 33,000+ Free Product Specs
1,100+ manufacturers, 33,000+ building products organized by CSI MasterFormat with downloadable specs, AutoCAD, and Revit BIM families.
Open resource →CODE-ACCORD — Building Regulation NLP Dataset
862 sentences, 4,297 entities, 4,329 relations from 33 regulatory documents (1,595 pages) annotated by 12 experts. England and Finland.
Open resource →Data.gov — Building Code & Zoning Datasets
Building permits, zoning GIS data, development permits, property maintenance codes, land development codes, and state energy codes from the US government.
Open resource →eCFR — Electronic Code of Federal Regulations
All US federal regulations including HUD, ADA, OSHA, and fire codes in XML bulk format with continuous updates.
Open resource →ICC Digital Codes — Full US Building Codes
Full text of IBC 2024/2021, IRC, IFC (Fire), IMC, IPC, IECC and more. Searchable online free; REST API via Code Connect (paid).
Open resource →IFC BIM QA Dataset
13,485 question-answer pairs covering BIM and IFC domain knowledge for training/testing LLMs on BIM-specific queries.
Open resource →National Zoning Atlas — US Zoning Data
Standardized zoning data covering 200+ regulatory characteristics across the US. Most comprehensive national zoning dataset.
Open resource →NFPA Free Access — 300+ Fire Codes
Full text of NFPA 101 (Life Safety), NFPA 72 (Fire Alarm), NFPA 13 (Sprinkler), and 300+ fire codes via NFPA LiNK.
Open resource →Purdue PTBC — Building Code NLP Corpus
Part-of-speech tagged building code corpus used to train Bi-LSTM RNN with BERT for building code NLP. 95.11% precision POS tagger.
Open resource →Uniclass 2015 — UK Construction Classification
Unified classification system for UK construction covering products, systems, activities, and spaces. Used for BIM and specification classification.
Open resource →UpCodes — US Building Codes (80+ Jurisdictions)
80+ US jurisdictions, 190K+ local amendments, 6M+ code sections with AI Copilot for code research.
Open resource →No matching resources in this tab.