Resource search

Search DataDrivenAEC

Open the full search page →

User-entered fee basisArithmetic only

Architecture Fee
Calculator

Apply a fee percentage from your own proposal or agreed compensation basis to a construction-cost amount with aligned scope, currency, and base date.

Who it's for: architects, firm principals, and owners reconciling an already established fee basis at any phase from schematic design through construction administration.

No market rate or phase split is supplied
AIA B101 describes services and compensation structures but does not prescribe a fee percentage. Define services, exclusions, reimbursables, consultants, phase allocation, and commercial terms separately.

Published benchmarks

Published fee curves and phase splits. Fees are negotiated; these are the public schedules that exist, not a recommendation.

BenchmarkValueUnitEditionScopeSource
Federal cap on A/E design fee6% of estimated construction costFAR 15.404-4(b)(4)(i)(B)US federal contractsFederal Acquisition Regulation 15.404-4
Basic services fee, $1M construction cost, Level A (most complex)12.09% of construction costEffective 1 July 2025Washington State public projects, design-bid-buildWashington State OFM, Capital Budget Instructions 2025-27, Ch. 9 A/E Fee Guidelines
Basic services fee, $1M construction cost, Level B10.65% of construction costEffective 1 July 2025Washington State public projects, design-bid-buildWashington State OFM, Capital Budget Instructions 2025-27, Ch. 9 A/E Fee Guidelines
Basic services fee, $1M construction cost, Level C (least complex)9.21% of construction costEffective 1 July 2025Washington State public projects, design-bid-buildWashington State OFM, Capital Budget Instructions 2025-27, Ch. 9 A/E Fee Guidelines
Basic services fee, $5M construction cost, Level A10.65% of construction costEffective 1 July 2025Washington State public projects, design-bid-buildWashington State OFM, Capital Budget Instructions 2025-27, Ch. 9 A/E Fee Guidelines
Basic services fee, $10M construction cost, Level A9.88% of construction costEffective 1 July 2025Washington State public projects, design-bid-buildWashington State OFM, Capital Budget Instructions 2025-27, Ch. 9 A/E Fee Guidelines
Phase split: schematic design18% of basic services feeEffective 1 July 2025Washington State public projects, design-bid-buildWashington State OFM, Capital Budget Instructions 2025-27, Ch. 9 A/E Fee Guidelines
Phase split: design development20% of basic services feeEffective 1 July 2025Washington State public projects, design-bid-buildWashington State OFM, Capital Budget Instructions 2025-27, Ch. 9 A/E Fee Guidelines
Phase split: construction documents31% of basic services feeEffective 1 July 2025Washington State public projects, design-bid-buildWashington State OFM, Capital Budget Instructions 2025-27, Ch. 9 A/E Fee Guidelines
Phase split: bidding2% of basic services feeEffective 1 July 2025Washington State public projects, design-bid-buildWashington State OFM, Capital Budget Instructions 2025-27, Ch. 9 A/E Fee Guidelines
Phase split: construction administration27% of basic services feeEffective 1 July 2025Washington State public projects, design-bid-buildWashington State OFM, Capital Budget Instructions 2025-27, Ch. 9 A/E Fee Guidelines
Phase split: project closeout2% of basic services feeEffective 1 July 2025Washington State public projects, design-bid-buildWashington State OFM, Capital Budget Instructions 2025-27, Ch. 9 A/E Fee Guidelines

Figures are as published on the linked page; check edition, scope and what the rate includes before using one.

Design Fee
Total + by phase

How to use this calculator

1
Define the cost basis
Align scope, currency, base date, exclusions, and whether the input is construction cost or another agreed basis.
2
Enter the agreed or proposed percentage
Use a rate supported by your own proposal, contract, staffing model, or fee analysis.
3
Record the source
Identify the proposal or commercial basis used for the entered percentage.
4
Reconcile the arithmetic
The result is cost basis multiplied by the entered percentage; it does not allocate services or test adequacy.

The formula

Entered fee amount = verified cost basis × entered fee percentage

No fee rate, phase allocation, service scope, or commercial term is inferred.

Worked example

Example
Enter a construction-cost basis and percentage taken from the applicable proposal or agreement; no example market rate is supplied.

When this estimate will be off

  • The fee is calculated on construction cost, not total project cost. Including land, FF&E, contingency, or the design fee itself in the input will inflate the result.
  • No phase allocation or service adequacy is calculated.
  • Reimbursable expenses and additional services (renderings, feasibility studies, as-builts, specialty-consultant coordination) are billed separately and are not included here.

Frequently asked questions

A common mistake: The fee is calculated on construction cost, not total project cost. Including land, FF&E, contingency, or the design fee itself in the input will inflate the result.

Use the percentage supported by the actual proposal, scope, staffing model, procurement route, consultant responsibility, risk, and commercial agreement. This tool does not supply a market rate.

On construction cost — the cost of the building work itself, excluding land, financing, furniture, and the design fee. State which basis you are using in your proposal so the percentage is not misread.

No. AIA B101 defines scope and compensation terms but does not supply a fee percentage. Use the actual proposal or agreement as the input source.

This tool does not allocate the fee. Phase allocation must follow the actual service scope, delivery model, staffing plan, and agreement.

Sources

  • AIA B101-2017 Owner–Architect Agreement — defines five basic-service phases and the basis of compensation; does not mandate a fee percentage — antitrust law prohibits published rate schedules

This free Architecture Fee Calculator is built and maintained by DataDrivenAEC, using the relevant codes and standards. It does not substitute for professional judgment.