Hotel Construction Cost per Square Meter 2025 Calculator

Published reference: USD 227.90–334.95 per ft² (USD 2,453.10–3,605.37 per m²), Gordian / BD+C: Hotel construction costs for 2025, 2025 source column.

Hotel construction cost for a 15-story U.S. model averages $261.76 per square foot nationally in 2025 (about $2,818 per square meter; Gordian/RSMeans via BD+C), ranging from $227.90 per square foot ($2,453 per square meter) in Orlando to $334.95 ($3,605 per square meter) in New York. Development cost per room is a separate scope: the 2025 HVS survey puts the median across all segments at $219,000 per room, from about $167,000–$169,000 for limited-service to $409,000 for full-service and over $1,057,000 for luxury. These sources are U.S. only; we hold no sourced hotel cost for Cyprus, Thailand or other countries, so enter your own local rate there.

Who it's for: architects, owners, and estimators who need to apply a published reference or their own dated hotel construction rate using transparent arithmetic — not a market forecast — for a specific quantity and allowance set, at feasibility or schematic design.

Hotel construction cost per m² or ft²

Choose a published reference, enter matching floor area, and calculate. Source facts travel with the result; you do not need to retype them.

Compare published rates and source details

Calculate from a published area rate

Choose a published reference; no rate or location is selected automatically.

Choose a reference to review its period and cost scope before calculating.

Use the selected source definition of floor area. Do not enter room, bed or seat counts.

Reference arithmetic, not a project budget. No current-price adjustment, currency conversion or extra allowance is applied. A rate's cost inclusions remain those of its source.

Have a project-specific rate or additional allowances? Use the separate manual calculation.

Quick U.S. hotel reference comparison

Choose a category and room count. Source currency, period and scope travel with the result.

Survey total development cost—not construction alone.HVS cautions against using its survey to determine the cost of a specific project. This is a reference comparison, not a local quote, valuation or approved budget.

HVS U.S. Hotel Development Cost Survey 2026 · published 2026-07-13 · costs observed in 2025 calendar year. No current-price adjustment or additional allowances are applied.

Compare one published category

Choose a published category; no rate is selected automatically.

Source values, scope and limitations
  • Select-service: about USD 200,000 per room.
  • Upscale extended-stay: about USD 265,000 per room.
  • Full-service: about USD 467,000 per room.

The survey covers land, building/site improvements, soft costs, FF&E, pre-opening/working capital and developer fee. Component medians must not be added to reconstruct the total; project-specific inclusions are not established here. This pilot supports three categories only; it does not interpolate missing categories.

Different editions elsewhere on this page are separate observations, not a year-to-year price index.

Have a project-specific rate? Use the separate manual scenario ↓

Calculate with your chosen rate

1. Quantity, unit and rate
2. Benchmark source and scope

Use the precision stated by the source: a year (2025), calendar quarter (2025-Q3), month (2025-08) or day (2025-08-15). Do not invent a month or copy the publication edition into this field.

State whether fees, contingency, land, external works, taxes and other costs are included. Unknown is not the same as excluded. Enter only additional, non-overlapping allowances.

3. Additional allowances
Scenario, not a forecast
Total = quantity × entered rate × (1 + entered allowances). Align currency, base date, scope, measurement basis, location, taxes, escalation and exclusions before comparing scenarios.

Published area rates and sources

Selected references in USD — converted area units, not new market observations
Reference and periodPublished / ft²Converted / m²
15-story hotel — U.S. national average (2025)2025 source columnUSD 261.76≈ USD 2,817.56
15-story hotel — Orlando (2025)2025 source columnUSD 227.90≈ USD 2,453.10
15-story hotel — New York (2025)2025 source columnUSD 334.95≈ USD 3,605.37
Method, source scope and period

1 ft² = 0.09290304 m². Divide a USD/ft² rate by this factor for USD/m². Divide m² area by the same factor before multiplying by the original rate. Only displayed values are rounded.

NIST area conversion definition. Unit conversion does not reconcile gross, net, finished or rentable area definitions.

15-story hotel — U.S. national average (2025)

15-story hotel construction model. Complete cost inclusions are not itemized; this is not a total-development budget. Use floor area measured on the source model basis. Gross, net and rentable areas are not interchangeable. No other hotel height, service tier or location is inferred. Room-based HVS development costs are a separate task.

Gordian / BD+C: Hotel construction costs for 2025 · publication date: 2025-04-17 · period: 2025 source column.

15-story hotel — Orlando (2025)

15-story hotel construction model. Complete cost inclusions are not itemized; this is not a total-development budget. Use floor area measured on the source model basis. Gross, net and rentable areas are not interchangeable. No other hotel height, service tier or location is inferred. Room-based HVS development costs are a separate task.

Gordian / BD+C: Hotel construction costs for 2025 · publication date: 2025-04-17 · period: 2025 source column.

15-story hotel — New York (2025)

15-story hotel construction model. Complete cost inclusions are not itemized; this is not a total-development budget. Use floor area measured on the source model basis. Gross, net and rentable areas are not interchangeable. No other hotel height, service tier or location is inferred. Room-based HVS development costs are a separate task.

Gordian / BD+C: Hotel construction costs for 2025 · publication date: 2025-04-17 · period: 2025 source column.

Selected figures read 2026-09-11. That check date is not a cost observation date. Missing inclusions remain unknown, not excluded; do not automatically add land, fees, FF&E, taxes or contingency.

Two source endpoints are separate scenarios, not a statistical interval. No bed, seat or room count is converted to area.

Published benchmarks

Development cost per key from the HVS survey, and construction cost per square foot from RSMeans. Pick a row to use it as the entered rate, or enter your own.

BenchmarkValueUnitEditionScopeSource
Limited-service (incl. midscale extended-stay), per key167,000–169,000$/key2025 survey (2024 projects)USHVS U.S. Hotel Development Cost Survey 2025 · read 2026-10-12
Select-service, per key~223,000$/key2025 survey (2024 projects)USHVS U.S. Hotel Development Cost Survey 2025 · read 2026-10-12
Upscale extended-stay, per key~265,000$/key2025 survey (2024 projects)USHVS U.S. Hotel Development Cost Survey 2025 · read 2026-10-12
Full-service, per key409,000$/key2025 survey (2024 projects)USHVS U.S. Hotel Development Cost Survey 2025 · read 2026-10-12
Luxury, per key>1,057,000$/key2025 survey (2024 projects)USHVS U.S. Hotel Development Cost Survey 2025 · read 2026-10-12Reference only — enter a verified rate separately
All-segment median, per key219,000$/key2025 survey (2024 projects)USHVS U.S. Hotel Development Cost Survey 2025 · read 2026-10-12
15-story hotel model, national average (10-city)261.76$/sf2025US national averageRSMeans data (Gordian), via Building Design + Construction
15-story hotel model, Orlando (low of 10 cities)227.90$/sf2025Orlando, FLRSMeans data (Gordian), via Building Design + Construction
15-story hotel model, New York (high of 10 cities)334.95$/sf2025New York, NYRSMeans data (Gordian), via Building Design + Construction
Hotel, 3-star, hard construction cost385–515$/sfQ1 2026Chicago, ILRLB Quarterly Construction Cost Report, North America, Q1 2026
Hotel, 5-star, hard construction cost530–810$/sfQ1 2026Chicago, ILRLB Quarterly Construction Cost Report, North America, Q1 2026
Hotel, 3-star, hard construction cost385–530$/sfQ1 2026New York, NYRLB Quarterly Construction Cost Report, North America, Q1 2026
Hotel, 5-star, hard construction cost530–795$/sfQ1 2026New York, NYRLB Quarterly Construction Cost Report, North America, Q1 2026

Each button selects the stated displayed value, not a typical rate, statistical confidence interval, or recommendation. Inequality bounds are reference-only. Figures are as published on the linked page; check edition, unit, scope and what the rate includes before using one. When a base-date field is present, enter its verified date yourself; a publication year is not a benchmark base month.

How to use this calculator

1
Choose keys or square feet as your quantity basis
HVS prices hotel development cost per key, by segment from limited-service through luxury, plus an all-segment median. RSMeans provides a published hotel construction model; RLB labels its separate rows as hard construction costs. Both use square feet. Enter the quantity in the unit matching the row you pick.
2
Match a benchmark row to your segment and market
HVS rows run limited-service through luxury by service tier. RSMeans gives a 10-city national average with Orlando as the low and New York as the high. RLB gives Chicago and New York 3-star and 5-star hard-cost ranges.
3
Enter allowances and reconcile
Add fees, contingency, and other allowances not already inside the benchmark rate, then compare the total against a project-specific quote rather than treating it as a forecast.

The formula

Base amount = entered quantity × entered rate. Total = base amount × (1 + fees% + contingency% + other allowance%).

Worked example

Example
Illustrative arithmetic only: 1,000 keys at a user-supplied rate of 200 per unit gives a base amount of 200,000. If the verified base rate excludes the entered 10% additional allowance, the scenario total is 220,000 in that same currency. This is not a published market benchmark.

When this estimate will be off

  • HVS gives development cost per key; the RSMeans area model does not itemize all cost inclusions, while RLB labels its separate area rates as hard construction costs. Do not combine these scopes or convert keys to floor area.
  • RLB hard-cost rows cover Chicago and New York only, at 3-star and 5-star; no other city or star rating has an RLB row on this page.
  • Benchmark rows on this page are sourced reference points, not market data for your project; no currency conversion is supplied.
  • No cost-plan, procurement, escalation, tax, finance, schedule, risk, or professional adequacy determination is made.

Frequently asked questions

Yes. Choose one of the published area references above and enter floor area in m² or ft². Its source, period and scope stay attached to the result. No unlisted model, local premium, current-price adjustment or complete project budget is inferred.

No. Room, bed and seat counts are not areas. Only the published area-reference form converts m² and ft², preserving the same area. The separate manual form needs a quantity and rate already expressed in matching units; no currency conversion is performed.

No. It applies transparent arithmetic to a user-supplied benchmark and allowances — it does not predict bids, escalation, or final cost.

Use a dated source for the same market, currency, measurement basis, scope, and project type as the hotel construction project you're estimating. The benchmark table above lists sourced reference points, not market data for your project.

So nothing already included in the base rate is counted twice. Enter only allowances not already reflected in the benchmark rate itself.

Only to the extent those costs are already included in your verified base rate or explicit additional allowances. This worksheet does not separately derive or validate escalation, taxes, finance, procurement risk, or professional adequacy.

Sources

  • User-identified cost source — must provide the rate, market, date, currency, measurement basis, scope, inclusions and exclusions

This free Hotel Construction Cost Calculator is built and maintained by DataDrivenAEC, using the relevant codes and standards. It does not substitute for professional judgment.