Retail Construction Cost Calculator: Fit-Out Rate per ft² (2026)
Published reference: USD 157.00 per ft² (USD 1,689.93 per m²), Cushman & Wakefield: 2026 U.S. Retail Fit Out Cost Guide, 2026 guide.
For an in-line store fit-out, apply the published U.S. average to matching floor area. For shell or ground-up retail work, use a separately verified manual rate.
Who it's for: architects, owners, and estimators who need to apply a published reference or their own dated retail construction rate using transparent arithmetic — not a market forecast — for a specific quantity and allowance set, at feasibility or schematic design.
Retail fit-out cost per m² or ft²
Choose a published reference, enter matching floor area, and calculate. Source facts travel with the result; you do not need to retype them.
Compare published rates and source details
Approximate published-reference total
Result, source and assumptions to copy
Reference arithmetic, not a project budget. No current-price adjustment, currency conversion or extra allowance is applied. A rate's cost inclusions remain those of its source.
Have a project-specific rate or additional allowances? Use the separate manual calculation.
—
Published area rates and sources
| Reference and period | Published / ft² | Converted / m² |
|---|---|---|
| In-line retail fit-out — U.S. national average (2026)2026 guide | USD 157.00 | ≈ USD 1,689.93 |
Method, source scope and period
1 ft² = 0.09290304 m². Divide a USD/ft² rate by this factor for USD/m². Divide m² area by the same factor before multiplying by the original rate. Only displayed values are rounded.
NIST area conversion definition. Unit conversion does not reconcile gross, net, finished or rentable area definitions.
In-line retail fit-out — U.S. national average (2026)
U.S. national average for an in-line store fit-out, based on the publisher contractor survey; not shell or ground-up construction. Use store fit-out floor area consistent with the surveyed scope, not the entire shopping-center area. Specialist retail, shell work and total development costs are separate. This summary does not itemize every included cost.
Cushman & Wakefield: 2026 U.S. Retail Fit Out Cost Guide · publication date: not established · period: 2026 guide.
Selected figures read 2026-09-11. That check date is not a cost observation date. Missing inclusions remain unknown, not excluded; do not automatically add land, fees, FF&E, taxes or contingency.
Two source endpoints are separate scenarios, not a statistical interval. No bed, seat or room count is converted to area.
Published benchmarks
Retail hard construction cost per square foot by city (RLB) and in-line fit-out cost by region (Cushman & Wakefield). Pick a row to use it as the entered rate, or enter your own.
| Benchmark | Value | Unit | Edition | Scope | Source | |
|---|---|---|---|---|---|---|
| Retail, shopping center, hard construction cost | 205–335 | $/sf | Q1 2026 | Austin, TX | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, shopping center, hard construction cost | 250–400 | $/sf | Q1 2026 | Boston, MA | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, shopping center, hard construction cost | 220–465 | $/sf | Q1 2026 | Chicago, IL | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, shopping center, hard construction cost | 195–405 | $/sf | Q1 2026 | Los Angeles, CA | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, shopping center, hard construction cost | 365–730 | $/sf | Q1 2026 | New York, NY | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, shopping center, hard construction cost | 190–340 | $/sf | Q1 2026 | Washington, DC | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, strip center, hard construction cost | 195–260 | $/sf | Q1 2026 | Austin, TX | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, strip center, hard construction cost | 175–280 | $/sf | Q1 2026 | Boston, MA | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, strip center, hard construction cost | 170–280 | $/sf | Q1 2026 | Chicago, IL | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, strip center, hard construction cost | 160–235 | $/sf | Q1 2026 | Los Angeles, CA | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, strip center, hard construction cost | 385–775 | $/sf | Q1 2026 | New York, NY | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, strip center, hard construction cost | 155–255 | $/sf | Q1 2026 | Washington, DC | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| In-line retail fit-out, national average | 157 | $/sf | 2026 | US | Cushman & Wakefield 2026 U.S. Retail Fit Out Cost Guide | |
| In-line retail fit-out | 217 | $/sf | 2026 | Northern California | Cushman & Wakefield 2026 U.S. Retail Fit Out Cost Guide | |
| In-line retail fit-out | 202 | $/sf | 2026 | Pacific Northwest | Cushman & Wakefield 2026 U.S. Retail Fit Out Cost Guide | |
| In-line retail fit-out | 181 | $/sf | 2026 | New York City | Cushman & Wakefield 2026 U.S. Retail Fit Out Cost Guide | |
| In-line retail fit-out | 126 | $/sf | 2026 | Southeast US | Cushman & Wakefield 2026 U.S. Retail Fit Out Cost Guide | |
| In-line retail fit-out | 120 | $/sf | 2026 | Midwest US | Cushman & Wakefield 2026 U.S. Retail Fit Out Cost Guide |
Each button selects the stated displayed value, not a typical rate, statistical confidence interval, or recommendation. Inequality bounds are reference-only. Figures are as published on the linked page; check edition, unit, scope and what the rate includes before using one. When a base-date field is present, enter its verified date yourself; a publication year is not a benchmark base month.
How to use this calculator
The formula
Worked example
When this estimate will be off
- RLB shopping-center/strip-center rows are new hard construction cost; the Cushman & Wakefield in-line rows are fit-out cost only — confirm which basis your project needs.
- Cushman & Wakefield in-line fit-out rows cover six US regions only; no row exists outside those regions or outside the US.
- Benchmark rows on this page are sourced reference points, not market data for your project; no currency conversion is supplied.
- No cost-plan, procurement, escalation, tax, finance, schedule, risk, or professional adequacy determination is made.
Frequently asked questions
Yes. Choose one of the published area references above and enter floor area in m² or ft². Its source, period and scope stay attached to the result. No unlisted model, local premium, current-price adjustment or complete project budget is inferred.
No. Room, bed and seat counts are not areas. Only the published area-reference form converts m² and ft², preserving the same area. The separate manual form needs a quantity and rate already expressed in matching units; no currency conversion is performed.
No. It applies transparent arithmetic to a user-supplied benchmark and allowances — it does not predict bids, escalation, or final cost.
Use a dated source for the same market, currency, measurement basis, scope, and project type as the retail construction project you're estimating. The benchmark table above lists sourced reference points, not market data for your project.
So nothing already included in the base rate is counted twice. Enter only allowances not already reflected in the benchmark rate itself.
Only to the extent those costs are already included in your verified base rate or explicit additional allowances. This worksheet does not separately derive or validate escalation, taxes, finance, procurement risk, or professional adequacy.
Sources
- User-identified cost source — must provide the rate, market, date, currency, measurement basis, scope, inclusions and exclusions
This free Retail Construction Cost Calculator is built and maintained by DataDrivenAEC, using the relevant codes and standards. It does not substitute for professional judgment.