Retail Construction Cost Calculator
Apply a dated, location-specific construction rate and user-entered allowances. No market rate, regional factor, quality multiplier, fee, contingency, escalation, or external-works percentage is embedded.
Who it's for: architects, owners, and estimators who already have a dated retail construction benchmark rate and need transparent arithmetic — not a market forecast — for a specific quantity and allowance set, at feasibility or schematic design.
Published benchmarks
Retail hard construction cost per square foot by city (RLB) and in-line fit-out cost by region (Cushman & Wakefield). Pick a row to use it as the entered rate, or enter your own.
| Benchmark | Value | Unit | Edition | Scope | Source | |
|---|---|---|---|---|---|---|
| Retail, shopping center, hard construction cost | 205–335 | $/sf | Q1 2026 | Austin, TX | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, shopping center, hard construction cost | 250–400 | $/sf | Q1 2026 | Boston, MA | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, shopping center, hard construction cost | 220–465 | $/sf | Q1 2026 | Chicago, IL | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, shopping center, hard construction cost | 195–405 | $/sf | Q1 2026 | Los Angeles, CA | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, shopping center, hard construction cost | 365–730 | $/sf | Q1 2026 | New York, NY | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, shopping center, hard construction cost | 190–340 | $/sf | Q1 2026 | Washington, DC | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, strip center, hard construction cost | 195–260 | $/sf | Q1 2026 | Austin, TX | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, strip center, hard construction cost | 175–280 | $/sf | Q1 2026 | Boston, MA | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, strip center, hard construction cost | 170–280 | $/sf | Q1 2026 | Chicago, IL | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, strip center, hard construction cost | 160–235 | $/sf | Q1 2026 | Los Angeles, CA | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, strip center, hard construction cost | 385–775 | $/sf | Q1 2026 | New York, NY | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| Retail, strip center, hard construction cost | 155–255 | $/sf | Q1 2026 | Washington, DC | RLB Quarterly Construction Cost Report, North America, Q1 2026 | |
| In-line retail fit-out, national average | 157 | $/sf | 2026 | US | Cushman & Wakefield 2026 U.S. Retail Fit Out Cost Guide | |
| In-line retail fit-out | 217 | $/sf | 2026 | Northern California | Cushman & Wakefield 2026 U.S. Retail Fit Out Cost Guide | |
| In-line retail fit-out | 202 | $/sf | 2026 | Pacific Northwest | Cushman & Wakefield 2026 U.S. Retail Fit Out Cost Guide | |
| In-line retail fit-out | 181 | $/sf | 2026 | New York City | Cushman & Wakefield 2026 U.S. Retail Fit Out Cost Guide | |
| In-line retail fit-out | 126 | $/sf | 2026 | Southeast US | Cushman & Wakefield 2026 U.S. Retail Fit Out Cost Guide | |
| In-line retail fit-out | 120 | $/sf | 2026 | Midwest US | Cushman & Wakefield 2026 U.S. Retail Fit Out Cost Guide |
Figures are as published on the linked page; check edition, scope and what the rate includes before using one.
—
How to use this calculator
The formula
Worked example
When this estimate will be off
- RLB shopping-center/strip-center rows are new hard construction cost; the Cushman & Wakefield in-line rows are fit-out cost only — confirm which basis your project needs (src/config/calculator-benchmarks.ts:200-207).
- Cushman & Wakefield in-line fit-out rows cover six US regions only; no row exists outside those regions or outside the US (src/config/calculator-benchmarks.ts:202-207).
- Benchmark rows on this page are sourced reference points, not market data for your project; no currency conversion is supplied.
- No cost-plan, procurement, escalation, tax, finance, schedule, risk, or professional adequacy determination is made.
Frequently asked questions
A common mistake: RLB shopping-center/strip-center rows are new hard construction cost; the Cushman & Wakefield in-line rows are fit-out cost only — confirm which basis your project needs (src/config/calculator-benchmarks.ts:200-207).
No. It applies transparent arithmetic to a user-supplied benchmark and allowances — it does not predict bids, escalation, or final cost.
Use a dated source for the same market, currency, measurement basis, scope, and project type as the retail construction project you're estimating. The benchmark table above lists sourced reference points, not market data for your project.
So nothing already included in the base rate is counted twice. Enter only allowances not already reflected in the benchmark rate itself.
No. The result is base amount × (1 + fees% + contingency% + other allowance%) only. Escalation, taxes, finance, procurement risk, and professional adequacy are not determined by this worksheet.
Sources
- User-identified cost source — must provide the rate, market, date, currency, measurement basis, scope, inclusions and exclusions
This free Retail Construction Cost Calculator is built and maintained by DataDrivenAEC, using the relevant codes and standards. It does not substitute for professional judgment.