Resource search

Search DataDrivenAEC

Open the full search page →

Toggle Robotics

Automated rebar prefabrication using industrial robotics

Full-stack hardware, software, and services solution that automates the prefabrication and assembly of reinforcing steel (rebar) using industrial robotic workcells. Transforms construction drawings into optimized manufacturing programs and delivers pre-assembled rebar cages to job sites.

$15M+ (Seed: $3M, Series A: $8M, Additional: $3M+) raisedGrowth Stage
Founded 2016 · 10-20+ customers with repeat orders (concrete contractors, general contractors, precast companies). Confirmed customers: Miller Bros., Salit Steel. Tokyu Construction (Japan) invested in Series A expansion.
Website →← All Tools

Why This Tool Exists

The Problem

Construction teams spend days manually tying and welding rebar cages on jobsites, which is labor-intensive, poses safety hazards, and creates schedule delays. Vertical construction projects waste 5-10% of schedule time on rebar assembly. Renewable energy and infrastructure projects spend weeks on prefabrication without quality consistency.

The Solution

Automates rebar cage assembly at off-site fabrication facilities using proprietary Weaver Workcell robotic systems. Toggle OS converts construction drawings into optimized robotic manufacturing programs. Pre-assembled cages are delivered ready-to-place to job sites, saving 70-90% of on-site rebar installation time while improving quality and safety.

How You Use It

Delivery Method
HardwareSaaSManufacturing Services
Integrations
Construction drawings (PDF, CAD, sketches)Project delivery via truck (300-mile radius from NY/PA facilities)
Project Phases
Construction Administration
Project Types
Commercial, Infrastructure, Residential, Industrial, Mixed-Use

Data Transparency

Exactly what this tool uses and how

Input
What it needs
Required:Rebar drawings from construction documents, Cage specifications and dimensions
Optional:Project schedule, Quality control specifications, Delivery timeline
Formats:PDF, CAD files, Hand sketches
Output
What you get
Format:Pre-assembled rebar cages delivered to jobsite
Fields:Completed rebar assemblies, Manufacturing quality inspection reports, Delivery logistics and scheduling
Algorithm
How it works
Model:Proprietary robotic path planning and motion control software (not machine learning-based)
Accuracy:Claims 99% success rate (inspections catch remaining 1%). Every tie and weld is visually inspected by construction expert.
Privacy
How your data is protected
Retention:Construction drawing data retained only as long as necessary for project delivery (project-based retention)
Training:Not publicly specified
Compliance:US data protection laws, Secure communication for drawing data transfer
API
Integration
Endpoint:Contact vendor for API access
Method:Not publicly documented

Use Cases

  • ·Automated rebar cage prefabrication for vertical construction projects
  • ·Pre-assembly for reinforced concrete infrastructure (bridges, dams, tunnels)
  • ·Renewable energy project foundation rebar fabrication
  • ·Precast concrete component reinforcement
  • ·Large-scale cage assembly with 70-90% time savings vs manual labor
  • ·Quality-controlled rebar assembly eliminating field rework

Pricing

Free
Not available
Pro
Per-project pricing based on cage quantity, complexity, and delivery distance (contact for quote)
Enterprise
Custom pricing and dedicated production capacity for high-volume customers
Sources & Research NotesResearch date: 2026-02-01
Fields Checked (20)
problem, solution, deliveryMethod, disciplines, projectPhases, projectTypes, yearFounded, maturityStage, customerBase, fundingTotal, input-required, input-formats, output-format, output-fields, algorithm-approach, algorithm-accuracy-claims, control-features, useCases, privacy-retention, privacy-location
Not Found (7)
integrations-third-party, api-documentation, specific-pricing-tiers, privacy-training-data, soc2-compliance, iso27001-compliance, detailed-algorithm-model-specs
About this research: This record summarizes the cited sources and fields checked. A research date does not establish hands-on testing. Consult the original sources for current details and limitations.