Resource search

Search DataDrivenAEC

Open the full search page →

ALICE

AI-powered construction scheduling and scenario optimization

World's first AI-powered generative construction scheduling platform that simulates millions of scenarios to identify the most efficient construction sequence, reducing project duration, labor costs, and equipment costs while managing complex constraints.

$65.8M raisedEstablished
Founded 2015 · Deployed on $100B+ of projects; Major contractors: Parsons, HDCC, Kajima Corporation; Infrastructure and industrial sectors
Website →← All Tools

Why This Tool Exists

The Problem

Construction teams manually create schedules that rarely optimize for efficiency, leading to extended timelines, suboptimal resource allocation, and significant cost overruns. Complex projects with thousands of tasks and dependencies overwhelm traditional scheduling tools. A typical $500M project loses $30M+ due to schedule inefficiency and inability to explore alternatives.

The Solution

Generates optimized construction schedules using proprietary AI that rapidly simulates millions of possible scenarios. Automatically identifies the most efficient task sequences, resource allocations, and strategies to meet objectives like minimizing duration, costs, or material waste. Enables scenario analysis to explore recovery strategies and assess impact of delays.

How You Use It

Delivery Method
SaaSWeb-based applicationAPI
Integrations
Oracle Primavera P6Microsoft ProjectOracle Primavera CloudBIM model imports (IFC)Drawing uploads
Project Phases
Construction Documentation, Bidding/Procurement, Construction Administration
Project Types
Commercial, Infrastructure, Industrial

Data Transparency

Exactly what this tool uses and how

Input
What it needs
Required:Construction schedule (P6, MSP, or manual entry), Project constraints (resources, deadlines)
Optional:3D BIM model, Project drawings, Design specifications, Risk factors
Formats:Oracle Primavera P6 files, Microsoft Project files, IFC (BIM models), PDF/JPG/PNG drawings, CSV/Excel constraints
Output
What you get
Format:Optimized construction schedules with visual representations and analytics
Fields:Optimized task sequences and dependencies, 2D visual layout overlaid on project drawings (ALICE Plan), 4D BIM schedule animation (ALICE Model), Critical path analysis with what-if scenarios, Resource allocation and leveling recommendations, Duration and cost estimates for alternatives, Risk assessment and contingency recommendations
Algorithm
How it works
Model:Proprietary AI-powered generative scheduling engine that simulates construction scenarios
Accuracy:Claims 17% reduction in project duration, 14% reduction in labor costs, 12% reduction in equipment costs on deployed projects (case-study based)
Privacy
How your data is protected
Retention:Project data retained in user account until deletion; retention policies vary by contract
Training:Not publicly specified whether production data is used for model training
Compliance:SOC 2 Type II, Cyber Essentials Plus, Annual third-party security audits, Data encryption in transit (TLS 1.2+) and at rest (AES-256), Role-based access controls
API
Integration
Endpoint:Contact vendor for API access
Method:REST API with Webhooks
Webhook support available

Use Cases

  • ·Automated optimization of project schedules to minimize duration and costs
  • ·Scenario analysis for schedule recovery and delay mitigation strategies
  • ·Multi-discipline coordination and critical path analysis
  • ·Bidding and proposal generation with optimized delivery schedules
  • ·4D BIM-based construction sequence planning and visualization
  • ·Resource leveling and equipment cost optimization
  • ·Risk assessment through millions of simulated scenarios

Pricing

Free
Not publicly offered
Pro
Contact vendor for pricing
Enterprise
Custom pricing based on project size and contract terms. Minimum project value: $75M+
Sources & Research NotesResearch date: 2026-04-03
Fields Checked (22)
problem, solution, deliveryMethod, integrations, disciplines, projectPhases, projectTypes, yearFounded, maturityStage, fundingTotal, customerBase, input-required, input-optional, input-formats, output-format, output-fields, algorithm-approach, algorithm-accuracy, privacy-compliance, api-webhook, useCases, vendor
Not Found (5)
pricing-specific-amounts, api-rate-limits, detailed-data-retention-days, model-training-practices-explicit, iso27001-certification
About this research: This record summarizes the cited sources and fields checked. A research date does not establish hands-on testing. Consult the original sources for current details and limitations.